What We Do

Services

Here's the full list of deck work we handle, from framing up through railings.

Home › Services

Everything we take on

Every job below is one we do ourselves across Biloxi.

Deck Installation

We frame new decks from the footings up, using treated pine or composite board over a pressure-treated frame. Joist spacing and footing depth get set to the span and load the design calls for, not just whatever's fastest to build.

Deck Repair

Soft boards, wobbly railings and sagging joists usually mean water's gotten somewhere it shouldn't. We replace the framing member or connection that actually failed instead of screwing a new board over the top of the problem.

Custom Deck Design

Multi-level decks, built-in benches, and layouts that work around an existing pool or pergola. We draw it out and walk through board direction, railing style and stair placement before any lumber gets ordered.

Composite Decking

Composite boards don't need staining and hold up better than wood against Gulf Coast humidity, though they cost more up front. We install hidden fastener systems so the surface stays clean without visible screw heads.

Deck Staining & Sealing

Pressure-treated pine takes a few months to dry out before stain will take properly. We strip, sand and seal decks on a schedule that matches how the wood is actually weathering, not just once a year regardless.

Deck Railing Installation

Railing height and baluster spacing follow local building code, and we build to that instead of guessing. Wood, cable and aluminum railing all get installed with posts bolted through the rim joist, not toe-screwed into the decking.

Deck Board Replacement & Resurfacing

If the frame underneath is still sound, replacing the decking boards is a lot cheaper than tearing out the whole structure. We check every joist for soft spots before resurfacing over it.

Screened Porch & Deck Combinations

A lot of homeowners here want part of the deck open and part of it screened against mosquitoes. We frame the screened section to its own roofline and keep the open deck separate, so one section doesn't leak onto the other.

Deck Demolition & Removal

Old decks built on buried posts or undersized footings sometimes aren't worth saving. We tear out and haul off the old structure and check what's underneath before building anything new on that spot.

Pergolas & Shade Structures

A pergola over part of the deck cuts down the afternoon sun without blocking it completely. We tie the posts into the existing deck framing instead of setting them in separate footings next to it.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Biloxi, MS

Deck construction and repair work covers these Gulf Coast communities.

Biloxi, MS
Gulfport, MS
Pascagoula, MS
Gautier, MS
Ocean Springs, MS
Long Beach, MS
D'Iberville, MS
Moss Point, MS
Bay St. Louis, MS
Diamondhead, MS
Waveland, MS
Pass Christian, MS
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Most deck construction over 30 inches off the ground or attached to the house requires a building permit in Harrison and Jackson County, Mississippi. Permit applications and inspection scheduling are typically handled as part of the deck construction process.
How long does it take to build a deck?
A standard single-level deck of 200 to 400 square feet usually takes one to two weeks from the first footing to the final board, weather permitting. Multi-level decks, screened porch combinations or custom railing work can extend that to three or four weeks.
Can deck construction be adjusted to fit a budget?
Deck size, decking material and railing style can all be adjusted to fit a target budget without compromising the framing underneath, which should never get cut for cost. Pressure-treated pine with a standard railing is usually the lowest-cost option that still holds up long-term.
Is deck construction work guaranteed?
Workmanship on deck construction is typically covered under warranty for a set period after completion, with details spelled out in the written quote. Decking material itself often carries its own manufacturer warranty, separate from the installation warranty.
Who will I be dealing with day to day during a deck project?
A single point of contact handles the site visit, the quote and the day-to-day work on most deck projects, so questions don't get lost between different people. That same contact walks through the finished deck at the end.
What decking materials are available?
Pressure-treated southern yellow pine, cedar and composite decking from brands like Trex or TimberTech are the main material options on the Gulf Coast. Pine requires periodic staining, cedar weathers naturally if left unfinished, and composite requires occasional washing but no staining.
Can I still use my yard or house during deck construction?
Deck construction and repair work is done without requiring entry into the house, and most of the yard stays usable except for the immediate work area. Material delivery and footing excavation require some space near the build site for a few days.
How should I prepare the site before deck work begins?
Clearing furniture, grills, planters and landscaping within about ten feet of the existing deck or planned build site makes the first day go faster. Marking the location of sprinkler lines or buried cable in the yard is also worth doing before footing excavation starts.
What happens if rot or a hidden problem turns up mid-project?
If hidden rot, an undersized footing, or a damaged ledger board turns up once old decking is removed, the issue gets flagged before continuing and priced separately from the original quote. Covering over a known problem isn't how a deck project should be finished.
How should a finished deck be maintained?
Pressure-treated pine should be cleaned and restained roughly every two to three years on the Gulf Coast due to UV and humidity exposure, while composite decking mainly requires periodic washing to prevent mildew buildup. Keeping gutters and downspouts clear of the deck area also reduces standing water against the framing.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (228) 256-4117